Work

Alt Text
UPS Replacement

Group Metropolitan were engaged to replace the current 2N Vertiv …

Alt Text
Commercial Office Fit Out

M&E Fit Out of new collaborative workspace across 4 floors.

Alt Text
Retail Unit Whitebox Fit Out

Fit out of whitebox in readiness for new brand moving …

Alt Text
Commercial Fit Out

Full turnkey fit out of four office floors in the …

Alt Text
Garden of Light

Installation of new immersive lighting experience at Ashford Designer Outlet

Alt Text
Live Replacement of Building Management System

Replacement of BMS System within an operational data centre to …

Alt Text
HV Infrastructure Replacement

Lifecycle replacement of HV Infrastructure at the Science Museum.

Alt Text
Fire Alarm Replacement

Replacement of landlords fire alarm system in an occupied building …

Alt Text
Critical Valve Replacements

Replacement of 600mm critical chilled water valves within an occupied …

Alt Text
Colocation Data Centre Resiliency Upgrade

Replacement of main electrical infrastructure in a live data centre.

Alt Text
Chiller Installation Project

Installation of new free cooling chiller at an operational data …

Alt Text
New Generator Installation

Installation of new generators to provide resilience to technical headquarters …

Alt Text
Data Suite Fit Out

550kVA N+N data suite fit out for new colocation client …

Alt Text
TEGG Preventative Maintenance

Annual TEGG testing regime with ultrasonic analysis and infrared thermal …

Alt Text
Specialist Testing for IST

UPS IST with long term power quality monitoring, ultrasonic analysis …

Alt Text
TEGG Maintenance and Fixed Electrical Testing

Combined TEGG maintenance and fixed wire testing to a critical …

Alt Text
Replacement LED Signage

Replacement of the existing signage on Citi for new LED …