Group Metropolitan has successfully completed LD6 COLO2 High-Density Cooling Deployment at a Data Centre in Slough. As Principal Contractor and Designer, the £1.8 million project was delivered over a 38-week programme, incorporating electrical, mechanical, BMS, leak detection and commissioning works within a live data-centre environment.
The project was initially developed as a High-Density Cooling installation before evolving into a Direct Liquid Cooling (DLC) deployment following a change in end-user requirements.