Brief
Group Metropolitan was appointed as Principal Contractor and Designer to complete the final stage of a BOH Lighting Upgrade for a client based in Canary Wharf, London.
Delivered over a 21-week programme, the project involved the replacement of end-of-life T5 lighting fittings with energy-efficient LED alternatives across back-of-house areas from the basement levels through to Level 33 and the roof.
The scope also incorporated Simmtronic LCM upgrades, presence detection and lighting control improvements, together with the safe removal and recycling of redundant T5 fittings. Emergency lighting was also upgraded to meet the requirements of BS 5266-1:2016.
The works were undertaken within an operational building, requiring careful planning and phased delivery to minimise disruption to building users and existing operations.