Process
GroupMetropolitan were engaged on a Design and Build contract to develop the Outline Scheme Design provided by the clients previously appointed design team. Team Design worked alongside Team Mechanical to take the design through to Stage 4, identifying some key risks that needed to be considered with the client.
Despite the recent replacement of a number of chillers, it was discovered that the site did not have a lifting plan. We employed a specialist lifting contractor to carry out ground scans and develop a lifting strategy that would serve the client for this project and also for any future works, providing detailed plan drawings for crane locations and weight limitations.
Upon approval of the lifting plan, Team Mechanical delivered the new chiller to site for final positioning and connection to the newly installed mechanical and electrical supplies. A thorough testing and commissioning process was developed and agreed with the client throughout the design and construction process, ensuring clarity on witnessing requirements and sign off.
The project was handed over to a very happy client who appreciated our collaborative approach to the project.